MANUFACTURING PROCESS

From Requirement to Finished Production

A clear manufacturing process helps keep product development, production and quality requirements aligned from the beginning of the project through packing and shipment preparation.

6 Steps Clear Production Flow
3–5 Days Typical Sampling
1,000 pcs MOQ / Style
PROCESS OVERVIEW

A Structured Path from Idea to Production

Each project begins with a review of your garment requirements before moving through sampling, approval, bulk production, inspection and packing.

01 Requirements

Tech pack, sample or reference.

02 Sampling

Develop the first sample.

03 Approval

Confirm sample and details.

04 Production

Move into bulk manufacturing.

05 Inspection

Review during and after production.

06 Packing

Prepare finished goods for shipment.

01
PROJECT REQUIREMENTS

Start with Clear Product Information

The project begins with understanding the garment you want to manufacture, the estimated quantity and the key production requirements.

01 Tech Pack

Construction, measurements and design information.

02 Reference Sample

A physical garment can also be used as a reference.

03 Reference Image

Useful when developing from an existing style direction.

04 Quantity & Market

Estimated order quantity and target market information.

STARTING POINT What to Send

Tech pack / sample / reference image

Estimated quantity

Target market

Target delivery date

02
SAMPLE DEVELOPMENT

Turn the Requirement into a Physical Sample

After reviewing the project, sample development helps confirm garment construction, materials, trims and key details before bulk production.

01 Construction Review

Review how the garment should be made.

02 Fabric & Trim Review

Confirm suitable materials and garment details.

03 Sample Making

Develop the first physical garment sample.

04 Detail Adjustment

Make necessary adjustments before approval.

TYPICAL SAMPLING 3–5 Days

Typical timing depends on the garment style, materials and project requirements.

03
SAMPLE APPROVAL

Confirm the Details Before Bulk Production

The sample provides a practical reference for reviewing garment construction and key project details before production begins.

01 Construction

Review garment structure and visible details.

02 Fabric

Confirm the material used for the project.

03 Trims

Review zippers, buttons, drawstrings and other trims.

04 Labels & Packing

Confirm private label and packing requirements where applicable.

REFERENCE Approved Sample

The confirmed sample helps provide a clearer reference for bulk production.

04
BULK PRODUCTION

Move into Commercial Manufacturing

After the sample and project details are confirmed, production moves into bulk manufacturing according to the approved requirements.

01 Production Preparation

Confirmed information is prepared for manufacturing.

02 Cutting & Sewing

Garment components move through the production process.

03 Garment Assembly

Construction and trims are completed according to requirements.

04 In-Process Review

Production details are checked during manufacturing.

MOQ From 1,000 pcs

Minimum order quantity is generally from 1,000 pieces per style.

05
QUALITY INSPECTION

Check Quality Throughout Production

Quality control is integrated into the manufacturing process, with checks during production and before finished garments move into packing.

01 Workmanship

Review visible sewing and garment construction.

02 Garment Details

Check relevant confirmed construction details.

03 Finished Appearance

Review overall appearance before packing.

04 Labels & Packing

Review relevant labeling and packing requirements.

EXPLORE QUALITY CONTROL →
QUALITY CONTROL In-House Inspection

Inspection is integrated into the manufacturing process rather than being treated only as a final step.

06
PACKING & SHIPMENT

Prepare Finished Goods for Shipment

After inspection, finished garments move into packing according to the confirmed project requirements before shipment preparation.

01 Final Review

Finished garments complete the required checks.

02 Labels

Relevant garment labels are checked before packing.

03 Packing

Garments are packed according to confirmed requirements.

04 Shipment Preparation

Finished goods are prepared for onward shipment.

FINAL STAGE Inspection → Packing

Goods move into packing after the required production and quality checks are completed.

BEFORE YOU START

What Helps Us Review Your Project Faster?

Providing clear information at the beginning helps our team understand the garment and production requirements more efficiently.

✓ Product Category
✓ Tech Pack
✓ Reference Image / Sample
✓ Estimated Quantity
✓ Target Market
✓ Target Delivery Date
READY TO START?

Send Us Your Next Apparel Project

Share your tech pack, sample or reference image together with the estimated quantity and target delivery date.

SEND MY PROJECT DETAILS → MOQ from 1,000 pcs / style